Poor Drainage Spec
A surface laid without a 1 percent cross-slope traps water at the baseline after every Charlotte downpour, accelerating surface failure.
Graded Base First
The builder grades the site and confirms slope before any base material is placed, so runoff moves away from the playing surface.